Maryland Transportation Authority (MdTA)

Fort McHenry Tunnel - Lane Control Signals & Dynamic Message Sign System Upgrade (Contract # FT706-000-002)

Task Order: CPM Schedule for Fort McHenry Tunnel ITS Signals and Signage:

RAM was contracted to develop the project schedule for the removal and installation of Dynamic Message Signs (DMS) and Lane Control Signals (LCS) near and inside the four bores of the Fort McHenry Tunnel.