Department Of Public Works / Engineering Division - Arlington County

Task: Form-work Shop Drawings for Lyon Village Retaining Walls (per Specification 033000.1.04D )

  • Develop Formwork Shop Drawings as described in Specification Section 033000, paragraph 1.04D
  • The length of the retaining wall is approximately 210' along with North and East section of the tennis courts as shown on Plan Sheet 7
  • The shop drawing shall be prepared by or under the supervision of a qualified professional engineer
  • The show drawings will contain detail the notes related to the fabrication, assembly, support and stripping of formwork
  • Use the aluminum formwork from Western Forms
  • Shoring and Reshoring is called for in the specification but that process applies to multi-story building slabs, not to vertical retaining walls